Lift Station No. 1 Replacement

Lift Station 1 is located just feet from the Indian River Lagoon with finished elevations well below the lagoon and flood surface serving approximately 700 customers. During Hurricanes Matthew and Irma, influent flooded the dry well which housed electronics, pumps and associated equipment required for normal operations. This lift station does not have a generator and during relief efforts a portable generator has to be parked on the street to provide power. This project includes demolition and replacement of the station with a submersible pumping system incorporated in the wet well which will eliminate the need for confined space entry and improve worker safety as the pumps will be accessible via slide rail system. The scope also includes the addition of an emergency generator.

Status Construction
Design Start September 2020
Design Completion May 2021
Construction Start February 2022
Construction Completion May 2023
Spent Budget $645,804
Total Budget $1,382,420.50
Percent Construction Complete 42%
                                                  Statistics as of April 2023