- Home
- City Departments
- Utilities
- Engineering, Inspection & Land Development
- Utilities Technical Provisions & Standard Details
- Utilities Technical Provision Standard Detail Drawings
Utilities Technical Provision Standard Detail Drawings
Water Standard Detail Drawings
- 3 INCH AND LARGER METER WITH BACKFLOW PREVENTER ABOVE GROUND INSTALLATION
- A.C. PIPE TIE-IN ADA
- ALIGNMENT RING ADA
- BLOW OFF DETAIL 1
- BLOW OFF DETAIL 2 ADA
- BLOW OFF DETAIL 3 ADA
- CANAL OR DRAINAGE DITCH CROSSING ADA
- DOUBLE CHECK DETECTOR ASSEMBLY ADA
- DOUBLE LINE STOP DETAIL ADA
- FIRE HYDRANT DETAIL ADA
- FIRE HYDRANT GUARD POSTS ADA
- JACK AND BORE ADA
- JUMPER METER ASSEMBLY ADA
- LINE STOP DETAIL FOR TIE IN OR CAPPING EXISTING WATER MAIN ADA
- MASTER FIRE SERVICE METER ASSEMBLY ADA
- SCHEMATIC MASTER FIRE SERVICE METER ASSEMBLY
- MASTER FIRE SERVICE METER ASSEMBLY DOUBLE CHECK BYPASS
- N-PATTERN DOUBLE CHECK DETECTOR ASSEMBLY ADA
- POLY WRAP ADA
- RESTRAINED PIPE TABLE WATER AND RECLAIMED ADA
- SOLID SLEEVE DETAIL ADA
- STORM DRAIN CROSSING ADA
- SWALE CROSSING ADA
- TAPPING SADDLE AND VALVE ADA
- THRUST BLOCK NOTES AND DETAILS ADA
- THRUST COLLAR WATER AND RECLAIMED 1 OF 2 ADA
- THRUST COLLAR WATER AND RECLAIMED 2 OF 2
- TRACER WIRE DETAIL ADA
- TYPICAL BORE PLAN ADA
- TYPICAL LOT SERVICE LINE LOCATION
- TYPICAL REQUIRED SEPARATION ADA
- TYPICAL SERVICE LINE ADA
- VALVE EXTENSION STEM
- VALVE INSERT
Wastewater Standard Detail Drawings
- AIR RELEASE VALVE
- CHECK VALVE VAULT
- DOUBLE SERVICE DETAIL
- DUPLEX PUMP JUNCTION BOX
- DUPLEX PUMP STATION CONTROL PANEL ADA
- DUPLEX PUMP STATION TERMINAL BLOCK LAYOUT
- DUPLEX PUMP STATION WIRING SCHEMATIC 2
- DUPLEX PUMP STATION WIRING SCHEMATIC 3
- DUPLEX PUMP STATION WIRING SCHEMATIC 4
- DUPLEX PUMP STATION WIRING SCHEMATIC
- ELECT ELEV 1 OF 6
- ELECT ELEV 2 OF 6
- ELECT ELEV 3 OF 6
- ELECT ELEV 4 OF 6
- ELECT ELEV 5 OF 6
- ELECT ELEV 6 OF 6
- FORCE MAIN CONNECTION TO MANHOLE
- LIFT STATION 1 OF 4
- LIFT STATION 2 OF 4
- LIFT STATION 3 OF 4
- LIFT STATION 4 OF 4
- LIFT STATION SITE PLAN
- MANHOLE FRAME AND COVER
- MANHOLE INVERT
- PUMP JUNCTION BOX BACK PLATE
- RESTRAINED PIPE TABLE FOR FORCE MAINS
- RTU COMMUNICATION LAYOUT 1-6
- RTU INSTALLATION DETAILS 1-14
- RTU INSTALLATION SPECIFICATIONS 1-14
- RTU INTERCONNECTIONS TO PUMP CONTROL PANEL 1-13
- RTU IO CARD NO 1 1-8
- RTU IO CARD NO 2 ANALOG INPUTS 1-10
- RTU IO CARD NO 2 DIGITAL INPUTS 1-9
- RTU IO CARD NO 3 ANALOG INPUTS 1-12
- RTU IO CARD NO 3 DIGITAL INPUTS 1-11
- RTU PANEL BILL OF MATERIALS 1-5
- RTU PANEL LAYOUT 1-3
- RTU PANEL TERMINAL LAYOUT 1-4
- RTU POWER DISTRIBUTION 1-7
- SINGLE SERVICE DETAIL
- TRANSITION COUPLING
- TRIPLEX PUMP JUNCTION BOX
- TRIPLEX PUMP STATION CONTROL PANEL 2
- TRIPLEX PUMP STATION CONTROL PANEL
- TRIPLEX PUMP STATION TERMINAL BLOCK 2
- TRIPLEX PUMP STATION TERMINAL BLOCK 3
- TRIPLEX PUMP STATION TERMINAL BLOCK
- TRIPLEX PUMP STATION WIRING SCHEMATIC 2
- TRIPLEX PUMP STATION WIRING SCHEMATIC 3
- TRIPLEX PUMP STATION WIRING SCHEMATIC
- TYPICAL MANHOLE
- TYPICAL MANHOLE WITH OUTSIDE DROP
- TYPICAL POLYMER CONCRETE MANHOLE ADA
- TYPICAL SERVICE